Panels, Panels, Panels

SpartanSolar - Wolverine is nearing completion. The final shipment of panels was received on December 10th which gave the crews time to get them installed before the bitter cold weather hit. We've also installed a split rail fence boundary and are getting final signage up.  Next week, our inverter manufacturer Solectria will be sending personnel [...]

By |2017-01-26T17:52:38+00:00December 15th, 2016|Uncategorized|0 Comments

Racked And Ready To Go

The pounding of posts gave way to the clanging of racking assembly at the beginning of the month, and we're happy to say that the racking on our 1.2 MW project is fully installed.  The crews are now running conduit to and from the inverters and doing some finishing touches on the above ground electrical [...]

By |2017-01-26T17:53:04+00:00November 11th, 2016|Uncategorized|0 Comments

Construction Has Begun!

Construction has commenced on SpartanSolar-Wolverine, our cooperative's 1.2 MW solar array across from Wolverine's headquarters. In the past month, site work has been completed including installing a parking lot, service road, and the interconnect between the new array and the substation across the road. Right now, hundreds of metal posts are being pounded into the [...]

By |2017-01-26T17:53:29+00:00October 19th, 2016|Uncategorized|0 Comments
Go to Top